A BETTER WAY TO BUILD

Steel Where Strength Matters.

Wood Where It Makes Sense.

K Buildings combine an engineered steel mainframe with #1 Southern Yellow Pine secondary framing, giving contractors and building owners the strength, flexibility and clear-span capability of steel without requiring an all-steel building.

Buy just the engineered K Building frames, add the specified lumber package or purchase the complete building package through a K Building dealer​.

Just the Frames

Frame + Lumber

Complete Building

SEE WHAT MAKES A K BUILDING DIFFERENT

WHAT EXACTLY IS A K BUILDING?

Engineered Steel Mainframe

#1 Southern Yellow Pine

Welded Connection Clips

Clear Span Interior

Concrete Foundation

Not a pole building.  

Not a conventional all-steel building.  

A smarter combination of both.

WHY BUILDERS CHOOSE A K BUILDING

  • Engineered Steel Mainframes
    The primary structure carries the load to the foundation.
  • No Buried Wood Posts
    Steel frame legs terminate at the concrete foundation
  • Pre-Engineered Connections
    Welded clips and predetermined attachment locations help ensure the building is built as designed
  • Wide Clear Spans
    Up to 100′
  • Vaulted Interior
    Usable overhead space for lofts, storage and equipment
  • Flexible Door Placement
    Large overhead, sliding, bi-fold and hydraulic door openings
  • Wood Secondary Framing
    Familiar material for contractors and easier interior finishing
  • Buy It Your Way
    Frames, frames + lumber or complete building

FOR CONTRACTORS

Already have suppliers for steel covering, doors, windows and trim?  Keep them. Purchase the K Building frames or frames + lumber and source the remaining components the way you already do business.

Keep Your Suppliers

Keep Your Margins

Build with the Crew You Already Trust

Buy Engineered Frames or Frames + Lumber

DESIGN OPTIONS

Clear Spans
24′ – 100′

Sidewall Heights
Up to 20′

Snow Load Designs
20psf – 70psf

Foundations
Pier
Wall
Monolithic Slab

Doors
Sidewall – Up to 45′
Endwall – Up to 80′

K BUILDING vs POST FRAME vs ALL STEEL

K BUILDING

POST FRAME

ALL STEEL

Steel Primary Frame

✔️

✖️

✔️

No Structural Wood Posts

✔️

✖️

✔️

Wood Secondary Framing

✔️

✔️

✖️

Easy Interior Finishing

✔️

✔️

Varies

Vaulted Interior

✔️

Varies

✔️

Wide Clear Spans

✔️

Limited/Varies

✔️

Contractor Can Use Familiar Suppliers

✔️

✔️

Varies

BUILT FOR WHAT YOU NEED

Farm Shops / Equipment Storage

Livestock

Commercial

Residential

Equestrian

Aviation Hangars

HOW K BUILDINGS ARE BUILT

From the first design conversation to the final installation, the K Building process helps you plan your project and keep construction moving.

Design Your Building

Start with your local K Building dealer or an Elgin Service Center sales location.  A knowledgeable professional will help you develop a building around your space, access and intended use.  Choose engineered frames, a frame-and-lumber package or a complete building package.

Prepare Your Site

Once your design is approved, CAD drawings are prepared and the anchor bolts along with their placement drawings are provided so site preparation can begin.  A production date is established to help coordinate foundation work, delivery and construction,

Receive Your Building Package

Your order is prepared for delivery with the components included in your selected package.  Complete packages include steel mainframes, lumber, hardware, steel coverings and specified accessories. Contractors purchasing frames or frames and lumber can source the remaining material through their own suppliers.

Assemble the Structure

Construction begins with the steel columns and rafters, followed by bracing and the initial wood girts and purlins.  The frames are aligned, squared and plumbed as installation progresses.  Once the steel framework is complete, the remaining wood framing is installed, followed by insulation, doors, windows and steel coverings as specified for your building.

Get Guidance Along the Way

Installation guidelines explain the assembly sequence and required tools and equipment.  Ask your K Building dealer for a copy or request them when submitting your quote request.  On-site construction typically takes approximately one to three weeks, depending on building size, complexity, crew availability, weather and site readiness.